Harrogate Convention Centre – Toilet Refurbishment Works

Project Value
£145,000

Duration
10 Weeks

Sector
Commercial

Whitaker and Leach refurbished the existing toilets at Harrogate Convention Centre, replacing the outdated interior with a more modern, state of the art design.

This required the stripping out of existing interior including floors and walls, followed by the re-wiring of Mechanical and Electrical fixings; whilst ensuring all services on other floors remained in use.

Further works included the formation of new ceilings and floor tiling along with the construction of new cubicles, urinals and corian sinks.

All hardwood features were made bespoke by Whitaker and Leach.

The inclusion of the patterned flooring tiles and illuminated wall panels together created an eye-catching, ultramodern finish, meeting the client’s requirements.

Harrogate Convention Centre – Toilet Refurbishment Works

Project Value
£145,000

Duration
10 Weeks

Sector
Commercial

Whitaker and Leach refurbished the existing toilets at Harrogate Convention Centre, replacing the outdated interior with a more modern, state of the art design.

This required the stripping out of existing interior including floors and walls, followed by the re-wiring of Mechanical and Electrical fixings; whilst ensuring all services on other floors remained in use.

Further works included the formation of new ceilings and floor tiling along with the construction of new cubicles, urinals and corian sinks.

All hardwood features were made bespoke by Whitaker and Leach.

The inclusion of the patterned flooring tiles and illuminated wall panels together created an eye-catching, ultramodern finish, meeting the client’s requirements.