Sandhill Academy – Swimming Pool Works

Project Value
£500,000.00

Duration
4 months

Sector
Education

The works involved the complete strip out of the existing amenity blocks including changing rooms, toilets, ceilings and floor coverings as well as the removal of the existing pool. The refurbishment works consisted of the construction of new moisture resistant stud walls, new IPS panels, toilets and ceilings throughout. A new mechanical and electrical design involved new ventilation, lighting and fire alarm. The works to the pool consisted of the removal and complete replacement of the existing swimming pool including draining down of the existing water.

Sandhill Academy – Swimming Pool Works

Project Value
£500,000.00

Duration
4 months

Sector
Education

The works involved the complete strip out of the existing amenity blocks including changing rooms, toilets, ceilings and floor coverings as well as the removal of the existing pool. The refurbishment works consisted of the construction of new moisture resistant stud walls, new IPS panels, toilets and ceilings throughout. A new mechanical and electrical design involved new ventilation, lighting and fire alarm. The works to the pool consisted of the removal and complete replacement of the existing swimming pool including draining down of the existing water.

We’d love to discuss your project, whatever stage you’re at,
Whitaker & Leach can help.

Contact us and let us make a difference.