Project Description

Huddersfield University – Students Central Defects

Project Value
£450,000.00

Duration
3 months

Sector
Education

This project consisted of works split into three difference sections. Section 1 involved the replacement of the existing curtain walling to the student’s central main entrance at the university. Section 2 involved the complete refurbishment of the existing changing rooms, toilets and treatment rooms, this involved the inclusion of new underfloor heating and insulation to prevent damp issues that the university had been having. Section 3 involved the replacement of the existing flooring within the gym area with a new purpose designed sports floor system.

Huddersfield University – Students Central Defects

Project Value
£450,000.00

Duration
3 months

Sector
Education

This project consisted of works split into three difference sections. Section 1 involved the replacement of the existing curtain walling to the student’s central main entrance at the university. Section 2 involved the complete refurbishment of the existing changing rooms, toilets and treatment rooms, this involved the inclusion of new underfloor heating and insulation to prevent damp issues that the university had been having. Section 3 involved the replacement of the existing flooring within the gym area with a new purpose designed sports floor system.

We’d love to discuss your project, whatever stage you’re at,
Whitaker & Leach can help.

Contact us and let us make a difference.

CONTACT US NOW