Harrogate Hospital – Wensleydale & ICU Refurbishment

Project Value
£4,100,000.00

Duration
9 months

Sector
Healthcare

The works involved refurbishment works to the existing ICU and Wensleydale Ward. Due to the ICU needing to remain open throughout, these works were done in a phased manor. Our works included the complete isolation and strip out of both areas back to the bear shells. New stud partitions were constructed to create more useable clinical spaces as well as new IPS panels, floor coverings and ceilings. In order to ensure that the project was completed on time, it was pivotal that there were high levels of communication between all parties, this was achieved through regular site meetings and visits.

Harrogate Hospital – Wensleydale & ICU Refurbishment

Project Value
£4,100,000.00

Duration
9 months

Sector
Healthcare

The works involved refurbishment works to the existing ICU and Wensleydale Ward. Due to the ICU needing to remain open throughout, these works were done in a phased manor. Our works included the complete isolation and strip out of both areas back to the bear shells. New stud partitions were constructed to create more useable clinical spaces as well as new IPS panels, floor coverings and ceilings. In order to ensure that the project was completed on time, it was pivotal that there were high levels of communication between all parties, this was achieved through regular site meetings and visits.

We’d love to discuss your project, whatever stage you’re at,
Whitaker & Leach can help.

Contact us and let us make a difference.