Harrogate Hospital – Herriots Restaurant Refurbishment

Project Value
£525,000.00

Duration
4 months

Sector
Healthcare

Whitaker and Leach were instructed to carry out the refurbishment of the existing restaurant at Harrogate Hospital during Covid as this section of the Hospital was quieter than it would be outside of Covid. The works involved the complete strip out of the existing restaurant including internal walls, ceilings, floor coverings and M&E fittings. The refurbishment works consisted of new bespoke pods and a servery counter constructed in Whitaker and Leach’s workshop. As well as this, new ceilings and floor coverings were fit and a full redecoration took place to uplift the area. A new ventilation system was installed and new LED light fittings.

Harrogate Hospital – Herriots Restaurant Refurbishment

Project Value
£525,000.00

Duration
4 months

Sector
Healthcare

Whitaker and Leach were instructed to carry out the refurbishment of the existing restaurant at Harrogate Hospital during Covid as this section of the Hospital was quieter than it would be outside of Covid. The works involved the complete strip out of the existing restaurant including internal walls, ceilings, floor coverings and M&E fittings. The refurbishment works consisted of new bespoke pods and a servery counter constructed in Whitaker and Leach’s workshop. As well as this, new ceilings and floor coverings were fit and a full redecoration took place to uplift the area. A new ventilation system was installed and new LED light fittings.

We’d love to discuss your project, whatever stage you’re at,
Whitaker & Leach can help.

Contact us and let us make a difference.