Project Description
Harrogate Convention Centre – WC Refurbishment
Project Value
£200,000.00
Duration
3 months
Sector
Leisure

Whitaker and Leach refurbished the existing toilets at Harrogate Convention Centre, replacing the outdated interior with a more modern, state of the art design. The works were carried whilst the site remained open. The inclusion of the patterned flooring tiles and illuminated wall panels together created an eye-catching, ultramodern finish, meeting the client’s requirements.


Harrogate Convention Centre – WC Refurbishment
Project Value
£200,000.00
Duration
3 months
Sector
Leisure

Whitaker and Leach refurbished the existing toilets at Harrogate Convention Centre, replacing the outdated interior with a more modern, state of the art design. The works were carried whilst the site remained open. The inclusion of the patterned flooring tiles and illuminated wall panels together created an eye-catching, ultramodern finish, meeting the client’s requirements.