Project Description

Derngate Theatre, Northampton – Refurbishment

Project Value
£150,000.00

Duration
2 months

Sector
Leisure

The Grade II listed building required general strip out works, including the removal of all existing carpets and internal partitions. The existing plywood and suspended ceiling were removed to expose the vaulted ceiling which was used as a design feature throughout the bar. New internal steps were formed between different floor levels and new timber glazed doors to match the existing external doors. Timber doors and the bar area were designed and manufactured by Whitaker and Leach.

Derngate Theatre, Northampton – Refurbishment

Project Value
£150,000.00

Duration
2 months

Sector
Leisure

The Grade II listed building required general strip out works, including the removal of all existing carpets and internal partitions. The existing plywood and suspended ceiling were removed to expose the vaulted ceiling which was used as a design feature throughout the bar. New internal steps were formed between different floor levels and new timber glazed doors to match the existing external doors. Timber doors and the bar area were designed and manufactured by Whitaker and Leach.

We’d love to discuss your project, whatever stage you’re at,
Whitaker & Leach can help.

Contact us and let us make a difference.

CONTACT US NOW