Batley Grammar School – New Extension

Project Value
£575,000.00

Duration
5 months

Sector
Education

The works involved the construction of a complete new-build extension including new foundations, drainage and paving works around the perimeter. As this was a pre-fabricated SIP building, once the foundations were cast, the building was installed by a subcontractor on site during the schools half term period. Once the building was installed, a timber roof structure was installed followed by a single ply roof. Once the building became watertight, the refurbishment works were started and completed during term time.

Batley Grammar School – New Extension

Project Value
£575,000.00

Duration
5 months

Sector
Education

The works involved the construction of a complete new-build extension including new foundations, drainage and paving works around the perimeter. As this was a pre-fabricated SIP building, once the foundations were cast, the building was installed by a subcontractor on site during the schools half term period. Once the building was installed, a timber roof structure was installed followed by a single ply roof. Once the building became watertight, the refurbishment works were started and completed during term time.

We’d love to discuss your project, whatever stage you’re at,
Whitaker & Leach can help.

Contact us and let us make a difference.